{"id":1906,"date":"2020-06-05T17:05:28","date_gmt":"2020-06-05T08:05:28","guid":{"rendered":"https:\/\/www.tenox.co.jp\/wordpress\/?page_id=1906"},"modified":"2020-06-17T15:21:11","modified_gmt":"2020-06-17T06:21:11","slug":"pile_method_06","status":"publish","type":"page","link":"https:\/\/www.tenox.co.jp\/en\/construction_method\/pile_method_06\/","title":{"rendered":"CMJ Method"},"content":{"rendered":"<div class=\"row sticky\">\r\n  <div class=\"col-md-3 menu-parent kouhou-parent wow fadeInUp\">\r\n  <div class=\"menu-side menu-side-kouhou\">\r\n    <h2><a href=\"\/en\/construction_method\/\">Method of Construction<\/a><\/h2>\r\n    <div class=\"menu-side-box\">\r\n      <h3>Pile Method<\/h3>\r\n      <ul class=\"side-s02\">\r\n        <li><a href=\"\/en\/construction_method\/pile_method_01\/\">TN-X Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/pile_method_02\/\">TN Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/pile_method_03\/\">Gantetsu Pile Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/pile_method_04\/\">NS ECO-PILE Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/pile_method_05\/\">ATTcolumn Method<\/a><\/li>\r\n        <li class=\"stay\">CMJ Method<\/li>\r\n        <li class=\"nolink\">EAZET Method<\/li>\r\n        <li class=\"nolink\">HiFB Method<\/li>\r\n        <li class=\"nolink\">RODEX Method<\/li>\r\n      <\/ul>\r\n    <\/div>\r\n    <div class=\"menu-side-box\">\r\n      <h3>Ground improvement method<\/h3>\r\n      <ul class=\"side-s02\">\r\n        <li><a href=\"\/en\/construction_method\/ground_method_01\/\">Tenocolumn Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/ground_method_02\/\">Tenocolumn ECO Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/ground_method_03\/\">TOFT Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/ground_method_04\/\">Pure Pile Method<\/a><\/li>\r\n        <li class=\"nolink\">Column Aproach Method<\/a><\/li>\r\n        <li class=\"nolink\">Multiwall Method<\/a><\/li>\r\n        <li class=\"nolink\">WIB Method<\/a><\/li>\r\n        <li class=\"nolink\">BASE BALANCE Method<\/a><\/li>\r\n        <li class=\"nolink\">CDM-LODIC Method<\/a><\/li>\r\n        <li class=\"nolink\">SAVE COMPOSER Method<\/li>\r\n      <\/ul>\r\n    <\/div>\r\n  <\/div>\r\n<\/div>\r\n\r\n  <div class=\"col-md-9\">\r\n    <div class=\"right-content kouhou-kui-ziban\">\r\n      <div class=\"content wow fadeInUp\">\r\n        <h2>CMJ Method<span>Concrete pile inner excavation pile method  Cement milk injection stirring method<\/span><\/h2>\r\n        <h3>About The CMJ Method<\/h3>\r\n        <p>In the CMJ method, excavation is performed while the soil inside the pipe is discharged using a screw head inserted inside the concrete pile. After reaching the specified support layer, cement milk is injected at high pressure and hardens, thus forming an expanded foot protection to support the structure. This method is widely applied in the fields of architecture and civil engineering.<\/p>\r\n      <\/div>\r\n      <div class=\"content wow fadeInUp\">\r\n        <h3>Features<\/h3>\r\n        <div class=\"row\">\r\n          <div class=\"col-md-7\">\r\n            <ol class=\"ko-num\">\r\n              <li>Tenox can design pile diameters from 400 mm to 1,000 mm.<\/li>\r\n              <li>Support is provided by large foot protections (1.2 to 2.0 times the pile diameter).<\/li>\r\n              <li>Construction efficiency is high and it is effective in shortening the construction period.<\/li>\r\n              <li>Widely applicable to civil engineering and architecture, with an extensive record of performance.<\/li>\r\n              <li>Also applicable as SC pile (with outer shell steel pipe).<\/li>\r\n            <\/ol>\r\n          <\/div>\r\n          <div class=\"col-md-5\">\r\n            <p><img decoding=\"async\" src=\"\/wordpress\/wp-content\/themes\/tenox\/images\/kouhou\/pile_method\/06\/01.jpg\" alt=\"\" class=\"img-responsive\">\r\n<span class=\"notes\">\u300cPile tip large foot protections\u300d<\/span><span class=\"notes left\">2ement milk is sprayed at a pressure of 200 kg\/cm2 or more to form an enlarged foot protection.The compressive strength is strong with 200-400 kg\/cm<sup>2<\/sup>.It evaluate support power in sand and gravel layer.<\/span><\/p>\r\n          <\/div>\r\n        <\/div>\r\n      <\/div>\r\n      <div class=\"content wow fadeInUp\">\r\n        <h3>Construction Methods<\/h3>\r\n        <p><img decoding=\"async\" src=\"\/wordpress\/wp-content\/themes\/tenox\/images\/kouhou\/pile_method\/06\/02.jpg\" alt=\"\" class=\"img-responsive\"><\/p>\r\n        <ol class=\"ko-num\">\r\n          <li>Drills until a specified support level while using an auger screw to excavate and discharge sediment at the tip of the pile.<\/li>\r\n          <li>When the head reaches the tip level, pre-drilling fluid is injected from the jet nozzle of the head at a pressure of 50 to 150 kg\/cm2.<\/li>\r\n          <li>After preliminary excavation, cement milk is sprayed at a pressure of 200 kg\/cm2 or more to form an enlarged foot protection.<\/li>\r\n        <\/ol>\r\n<p class=\"btn-02\" style=\"margin-top:30px;\"><a href=\"\/wordpress\/wp-content\/themes\/tenox\/images\/kouhou\/pdf\/leaflet_cmj.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Click Here for the Leaflet of the CMJ Method<\/a><\/p>\r\n      <\/div>\r\n    <\/div>\r\n  <\/div>\r\n<\/div>\r\n","protected":false},"excerpt":{"rendered":"Method of Construction Pile Method TN-X Method TN Method Gantetsu Pile Method NS ECO-PILE Method ATTcolumn Method CMJ Method EAZET Method HiFB Method RODEX Method Ground improvement method Tenocolumn Method Tenocolumn ECO Method TOFT Method Pure Pile Method Column Aproach Method Multiwall Method WIB Method BASE BALANCE Method CDM-LODIC Method SAVE COMPOSER Method CMJ MethodConcrete pile inner excavation pile method Cement milk injection stirring method About The CMJ Method In the CMJ method, excavation is performed while the soil inside the pipe is discharged using a screw head inserted inside the concrete pile. After reaching the specified support layer, cement milk is injected at high pressure and hardens, thus forming an expanded foot protection to support the structure. This method is widely applied in the fields of architecture and civil engineering. Features Tenox can design pile diameters from 400 mm to 1,000 mm. Support is provided by large foot protections (1.2 to 2.0 times the pile diameter). Construction efficiency is high and it is effective in shortening the construction period. Widely applicable to civil engineering and architecture, with an extensive record of performance. Also applicable as SC pile (with outer shell steel pipe). \u300cPile tip large foot protections\u300d2ement milk is sprayed at a pressure of 200 kg\/cm2 or more to form an enlarged foot protection.The compressive strength is strong with [&hellip;]","protected":false},"author":1,"featured_media":257,"parent":1380,"menu_order":167,"comment_status":"closed","ping_status":"closed","template":"templates\/page_templete_03.php","meta":{"_locale":"en_US","_original_post":"https:\/\/www.tenox.co.jp\/wordpress\/?page_id=715","_links_to":"","_links_to_target":""},"acf":[],"_links":{"self":[{"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/pages\/1906"}],"collection":[{"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/comments?post=1906"}],"version-history":[{"count":11,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/pages\/1906\/revisions"}],"predecessor-version":[{"id":2596,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/pages\/1906\/revisions\/2596"}],"up":[{"embeddable":true,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/pages\/1380"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/media\/257"}],"wp:attachment":[{"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/media?parent=1906"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}