{"id":1916,"date":"2020-06-05T17:15:09","date_gmt":"2020-06-05T08:15:09","guid":{"rendered":"https:\/\/www.tenox.co.jp\/wordpress\/?page_id=1916"},"modified":"2020-06-15T14:42:34","modified_gmt":"2020-06-15T05:42:34","slug":"ground_method_03","status":"publish","type":"page","link":"https:\/\/www.tenox.co.jp\/en\/construction_method\/ground_method_03\/","title":{"rendered":"TOFT Method"},"content":{"rendered":"<div class=\"row sticky\">\r\n  <div class=\"col-md-3 menu-parent kouhou-parent wow fadeInUp\">\r\n  <div class=\"menu-side menu-side-kouhou\">\r\n    <h2><a href=\"\/en\/construction_method\/\">Method of Construction<\/a><\/h2>\r\n    <div class=\"menu-side-box\">\r\n      <h3>Pile Method<\/h3>\r\n      <ul class=\"side-s02\">\r\n        <li><a href=\"\/en\/construction_method\/pile_method_01\/\">TN-X Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/pile_method_02\/\">TN Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/pile_method_03\/\">Gantetsu Pile Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/pile_method_04\/\">NS ECO-PILE Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/pile_method_05\/\">ATTcolumn Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/pile_method_06\/\">CMJ Method<\/a><\/li>\r\n        <li class=\"nolink\">EAZET Method<\/li>\r\n        <li class=\"nolink\">HiFB Method<\/li>\r\n        <li class=\"nolink\">RODEX Method<\/li>\r\n      <\/ul>\r\n    <\/div>\r\n    <div class=\"menu-side-box\">\r\n      <h3>Ground improvement method<\/h3>\r\n      <ul class=\"side-s02\">\r\n        <li><a href=\"\/en\/construction_method\/ground_method_01\/\">Tenocolumn Method<\/a><\/li>\r\n        <li><a href=\"\/en\/construction_method\/ground_method_02\/\">Tenocolumn ECO Method<\/a><\/li>\r\n        <li class=\"stay\">TOFT Method<\/li>\r\n        <li><a href=\"\/en\/construction_method\/ground_method_04\/\">Pure Pile Method<\/a><\/li>\r\n        <li class=\"nolink\">Column Aproach Method<\/a><\/li>\r\n        <li class=\"nolink\">Multiwall Method<\/a><\/li>\r\n        <li class=\"nolink\">WIB Method<\/a><\/li>\r\n        <li class=\"nolink\">BASE BALANCE Method<\/a><\/li>\r\n        <li class=\"nolink\">CDM-LODIC Method<\/a><\/li>\r\n        <li class=\"nolink\">SAVE COMPOSER Method<\/li>\r\n      <\/ul>\r\n    <\/div>\r\n  <\/div>\r\n<\/div>\r\n\r\n  <div class=\"col-md-9\">\r\n    <div class=\"right-content kouhou-kui-ziban\">\r\n      <div class=\"content wow fadeInUp\">\r\n        <h2>TOFT Method<span>Liquefaction-resistant grid-pattern soil improvement<\/span><\/h2>\r\n<h3>About The TOFT Method<\/h3>\r\n        <p>By performing soil improvement in a grid-pattern for sandy ground which may be prone to liquefaction caused by major earthquakes, this construction method suppresses shear deformation of sandy ground surrounded by the grid and prevents an increase in excess pore water pressure.<\/p>\r\n      <\/div>\r\n      <div class=\"content wow fadeInUp\">\r\n        <h3>Principle of the anti-liquefaction effect<\/h3>\r\n        <p><img decoding=\"async\" src=\"\/wordpress\/wp-content\/themes\/tenox\/images\/kouhou\/ground_method\/03\/01.jpg\" alt=\"\" class=\"img-responsive\"><\/p>\r\n      <\/div>\r\n      <div class=\"content wow fadeInUp\">\r\n        <h3>Features<\/h3>\r\n        <ul class=\"listDot\">\r\n          <li>By using a grid for the improvement shape, the structure can be made more economical.<\/li>\r\n          <li>Tenox possesses the optimum design technology for anti-liquefaction measures.<\/li>\r\n          <li>Since there is very little vibration and noise, construction can be performed close to urban areas and structures.<\/li>\r\n          <li>Tenox provides stable construction quality by using our own unique construction management system.<\/li>\r\n        <\/ul>\r\n      <\/div>\r\n      <!--<div class=\"content wow fadeInUp\">\r\n        <h3>\u9069\u7528\u4f8b<\/h3>\r\n        <p>\u672c\u5de5\u6cd5\u306f\u3001\u57fa\u790e\u5f62\u5f0f\uff08\u5e03\u57fa\u790e\u3001\u3079\u305f\u57fa\u790e\u306a\u3069\uff09\u306b\u62d8\u308b\u3053\u3068\u306a\u304f\u9069\u7528\u3067\u304d\u308b\u3068\u3068\u3082\u306b\u3001\u57fa\u790e\u3050\u3044\u3068\u306e\u4f75\u7528\u3082\u53ef\u80fd\u3067\u3059\u3002<\/p>\r\n        <p><img decoding=\"async\" src=\"\/wordpress\/wp-content\/themes\/tenox\/images\/kouhou\/ground_method\/03\/02.jpg\" alt=\"\" class=\"img-responsive\"><\/p>\r\n      <\/div>-->\r\n    <\/div>\r\n  <\/div>\r\n<\/div>\r\n","protected":false},"excerpt":{"rendered":"Method of Construction Pile Method TN-X Method TN Method Gantetsu Pile Method NS ECO-PILE Method ATTcolumn Method CMJ Method EAZET Method HiFB Method RODEX Method Ground improvement method Tenocolumn Method Tenocolumn ECO Method TOFT Method Pure Pile Method Column Aproach Method Multiwall Method WIB Method BASE BALANCE Method CDM-LODIC Method SAVE COMPOSER Method TOFT MethodLiquefaction-resistant grid-pattern soil improvement About The TOFT Method By performing soil improvement in a grid-pattern for sandy ground which may be prone to liquefaction caused by major earthquakes, this construction method suppresses shear deformation of sandy ground surrounded by the grid and prevents an increase in excess pore water pressure. Principle of the anti-liquefaction effect Features By using a grid for the improvement shape, the structure can be made more economical. Tenox possesses the optimum design technology for anti-liquefaction measures. Since there is very little vibration and noise, construction can be performed close to urban areas and structures. Tenox provides stable construction quality by using our own unique construction management system.","protected":false},"author":1,"featured_media":257,"parent":1380,"menu_order":165,"comment_status":"closed","ping_status":"closed","template":"templates\/page_templete_03.php","meta":{"_locale":"en_US","_original_post":"https:\/\/www.tenox.co.jp\/wordpress\/?page_id=732","_links_to":"","_links_to_target":""},"acf":[],"_links":{"self":[{"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/pages\/1916"}],"collection":[{"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/comments?post=1916"}],"version-history":[{"count":6,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/pages\/1916\/revisions"}],"predecessor-version":[{"id":2491,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/pages\/1916\/revisions\/2491"}],"up":[{"embeddable":true,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/pages\/1380"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/media\/257"}],"wp:attachment":[{"href":"https:\/\/www.tenox.co.jp\/wp-json\/wp\/v2\/media?parent=1916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}