TN MethodSteel pipe inner excavation pile method and cement milk injection stirring method
About The TN Method
In the TN method, drilling is performed while removing soil from inside the pipe via an auger screw inserted inside of the steel pipe pile. After reaching the specified support layer, cement milk is filled via high-pressure injection and the foot protection is hardened. These foundation pile methods support structures through the formed expanded foot protections for the tips. The methods are widely used in the civil engineering and construction fields, and they can also be applied to steel pipe sheet pile foundations.
Features
- Excavation performance is high and long construction is possible
- Wide applicability and extensive record of performance
- Applicable to steel pipe sheet pile foundations
- Construction is highly efficient and effective in shortening the construction period
Construction Method
Select by load/soil conditions
Building structure
- Detached homes (1 floor to 3 floors)
- Stores/townhouses (2 floors to 3 floors)
- Commercial buildings/residential complexes (4 floors to 5 floors)
- Hospitals/schools (4 floors to 5 floors)
- Factories (4 floors to 5 floors)
- Logistics warehouses (5 floors to 6 floors)
- Mid- and high-rise buildings/condominiums (5 floors to 15 floors)
- Out-of-plane seismic resistance
Civil engineering structures
Select by purpose
Support for buildings
Civil engineering structures
Reinforce earthquake resistance
Prevent soil liquefaction
Reduce environmental load
Prevent landslides
Construction Methods
Pile Method
- TN-X Method
- TN Method
- GANTETSU PILE Method
- NS ECO-PILE Method
- ATT COLUMN Method
- CMJ Method
- EAZET Method
- HiFB Method
- RODEX Method
Ground improvement method
- TENOCOLUMN Method
- TENOCOLUMN ECO Method
- TOFT Method
- PURE PILE Method
- Column Aproach Method
- Multiwall Method
- WIB Method
- BASE BALANCE Method
- CDM-LODIC Method
- SAVE COMPOSER Method