Building structureLogistics warehouses (5 floors to 6 floors)
Load Level | Support Layer Depth | Method |
---|---|---|
【Heavy】 ~20,000kN/pillar or ~200kN/square meter |
【Shallow】 2m~10m |
TENOCOLUMN Method |
WIB Method | ||
SAVE COMPOSER Method | ||
TOFT Method | ||
【Middle】 5m~40m |
NS ECO-PILE Method | |
【Deep】 10m~80m |
TN-X Method | |
NS ECO-PILE Method |
Select by load/soil conditions
Building structure
- Detached homes (1 floor to 3 floors)
- Stores/townhouses (2 floors to 3 floors)
- Commercial buildings/residential complexes (4 floors to 5 floors)
- Hospitals/schools (4 floors to 5 floors)
- Factories (4 floors to 5 floors)
- Logistics warehouses (5 floors to 6 floors)
- Mid- and high-rise buildings/condominiums (5 floors to 15 floors)
- Out-of-plane seismic resistance
Civil engineering structures
Select by purpose
Support for buildings
Civil engineering structures
Reinforce earthquake resistance
Prevent soil liquefaction
Reduce environmental load
Prevent landslides
Construction Methods
Pile Method
- TN-X Method
- TN Method
- GANTETSU PILE Method
- NS ECO-PILE Method
- ATT COLUMN Method
- CMJ Method
- EAZET Method
- HiFB Method
- RODEX Method
Ground improvement method
- TENOCOLUMN Method
- TENOCOLUMN ECO Method
- TOFT Method
- PURE PILE Method
- Column Aproach Method
- Multiwall Method
- WIB Method
- BASE BALANCE Method
- CDM-LODIC Method
- SAVE COMPOSER Method