• EN
  • JP
Company
  • Message
  • Management Philosophy
  • Company Profile
  • List of officers
  • History
  • Organization chart
  • Business information
  • Base information
Investor Relations
  • Management Policy
  • Corporate Performance and Financial Affairs
  • IR Library
  • To Individual Investors
  • Electronic public notice
  • IR News
  • Current Stock Price
  • FAQ
  • Disclaimer
  • IR Inquiries
Method of Construction
  • Support for buildings
  • Civil engineering structures
  • Prevent landslides
  • Prevent soil liquefaction
  • Reduce environmental load
  • Reinforce earthquake resistance
CSR
  • Basic Concept of CSR
  • Safety and Health Basic Policy
  • Information Security Basic Policy
  • General Employers Action Plan
  • Act on Promotion of Female Participation
  • Topics
  • IR News
  • Contact Us
PURE PILE Metohd
TOP/Method of Construction/PURE PILE Metohd
Method
Method
Piling Method
CP-X Method
TNーX Method
TN Method
GANTETSU PILE Method
NS ECO-PILE Method
ATT Column Method
CMJ Method
EAZET Method
HiFB Method
Soil Improvement Method
TENOCUBE Method
TENOCOLUMN Method
TENOCOLUMN-ECO Method
Lattice-Shaped Ground Improvement
PURE PILE Metohd
Wave Impeding Barrier
BASE Balance Method
CDM-LODIC Method
PURE PILE Metohd
Pile-shaped soil reinforcement method for detached homes
PURE PILE Method is a soil reinforcement method for building high-quality cement milk pillars that do not contain soil by withdrawing the rod while injecting cement milk. Tenox possesses a construction record of over 50,000 projects, mainly in detached houses.
Feature
Supports any soil characteristics.
Unlike the soil improvement method, the soil and cement milk are not agitated and mixed. Therefore, it is possible to build high-strength and high-quality pillars in humus soil layers and viscous soil layers.
Facilitates construction management.
The special rod is rotationally press-fitted to the specified depth and withdrawal is completed while injecting cement milk. Fast and reliable construction is possible without loosening the ground.
Almost no remaining soil.
Since the straight rod has no soil removal mechanism, there is almost no remaining soil. This means that there is no need to secure a space for remaining soil, and the worksite and surrounding roads are not dirtied when carrying the soil out.
Construction method providing cost advantages.
Since the construction period is short and the cost of remaining soil treatment is low, it is possible to perform construction at a lower cost than the soil improvement method and blade steel pipe pile method used for housing foundations.
Excavated pure pile (effective diameter 200mm)
Construction Method
1
Alignment
2
Rotational press fitting of the rod to a specified depth
3
Holds for approx. 30 seconds while injecting cement milk
4
Withdrawal while injecting cement milk
5
Adjustment of pillar top level
Detached house
Store (Supermarket)
Educational facility
Factory
Airport facilities
Stadium
Station
Residentilal building
Data center
Office building
Logistics facilities
Shopping mall
Hospital
Pedestrian deck
Road bridge pier
Railway bridge pier
Abutment
Water and sewage facilities
REPLAY
Detached house
Store (Supermarket)
Educational facility
Factory
Airport facilities
Stadium
Station
Residentilal building
Data center
Office building
Logistics facilities
Shopping mall
Hospital
Pedestrian deck
Road bridge pier
Railway bridge pier
Abutment
Water and sewage facilities
General building・Special building
Small-scale
Store (Supermarket)
Mid-scale
Educational facility
Factory
Airport facilities
Stadium
Station
Residentilal building
Data center
Office building
Large-scale
Logistics facilities
Shopping mall
Hospital
Small-scale building
Detached house
Civil engineering structures
Small-scale
Pedestrian deck
Large-scale
Road bridge pier
Railway bridge pier
Abutment
Water and sewage facilities
Liquefaction countermeasures
Liquefaction countermeasures
Vibration control
Vibration control
Construction Method
Piling Method
CP-X Method
TN-X Method
TN Method
GANTETSU PILE Method
NS ECO-PILE Method
ATT Column Method
CMJ Method
EAZET Method
HiFB Method
Soil Improvement Method
TENOCUBE Method
TENOCOLUMN Method
TENOCOLUMN-ECO Method
Lattice-Shaped Ground Improvement
PURE PILE Metohd
Wave Impeding Barrier Method
BASE Balance Method
CDM-LODIC Method

技術情報テノックスの技術開発体制をご紹介します

VIEW MORE

Company
  • Message
  • Management Philosophy
  • Company Profile
  • List of officers
  • History
  • Organization chart
  • Business information
  • Base information
Investor Relations
  • Management Policy
  • Corporate Performance and Financial Affairs
  • IR Library
  • To Individual Investors
  • Electronic public notice
  • IR News
  • Current Stock Price
  • FAQ
  • Disclaimer
  • IR Inquiries
Method of Construction
  • Support for buildings
  • Civil engineering structures
  • Prevent landslides
  • Prevent soil liquefaction
  • Reduce environmental load
  • Reinforce earthquake resistance
CSR
  • Basic Concept of CSR
  • Safety and Health Basic Policy
  • Information Security Basic Policy
  • General Employers Action Plan
  • Act on Promotion of Female Participation
  • Topics
  • IR News
  • Contact Us
  • Language Switcher

    • EN
    • JP

Contact Us

© Tenox Co., Ltd. All Rights Reserved.