General buildings
TOFT Method
By performing soil improvement in a grid-pattern for sandy ground which may be prone to liquefaction caused by major earthquakes, this construction method suppresses shear deformation of sandy ground surrounded by the grid and prevents an increase in excess pore water pressure.
SAVE COMPOSER Method
Detached homes
BASE BALANCE Method
Exterior parts, etc.
WIB Method
Select by load/soil conditions
Building structure
- Detached homes (1 floor to 3 floors)
- Stores/townhouses (2 floors to 3 floors)
- Commercial buildings/residential complexes (4 floors to 5 floors)
- Hospitals/schools (4 floors to 5 floors)
- Factories (4 floors to 5 floors)
- Logistics warehouses (5 floors to 6 floors)
- Mid- and high-rise buildings/condominiums (5 floors to 15 floors)
- Out-of-plane seismic resistance
Civil engineering structures
Select by purpose
Support for buildings
Civil engineering structures
Reinforce earthquake resistance
Prevent soil liquefaction
Reduce environmental load
Prevent landslides
Construction Methods
Pile Method
- TN-X Method
- TN Method
- GANTETSU PILE Method
- NS ECO-PILE Method
- ATT COLUMN Method
- CMJ Method
- EAZET Method
- HiFB Method
- RODEX Method
Ground improvement method
- TENOCOLUMN Method
- TENOCOLUMN ECO Method
- TOFT Method
- PURE PILE Method
- Column Aproach Method
- Multiwall Method
- WIB Method
- BASE BALANCE Method
- CDM-LODIC Method
- SAVE COMPOSER Method