• EN
  • JP
Company
  • Message
  • Management Philosophy
  • Company Profile
  • List of officers
  • History
  • Organization chart
  • Business information
  • Base information
Investor Relations
  • Management Policy
  • Corporate Performance and Financial Affairs
  • IR Library
  • To Individual Investors
  • Electronic public notice
  • IR News
  • Current Stock Price
  • FAQ
  • Disclaimer
  • IR Inquiries
Method of Construction
  • Support for buildings
  • Civil engineering structures
  • Prevent landslides
  • Prevent soil liquefaction
  • Reduce environmental load
  • Reinforce earthquake resistance
CSR
  • Basic Concept of CSR
  • Safety and Health Basic Policy
  • Information Security Basic Policy
  • General Employers Action Plan
  • Act on Promotion of Female Participation
  • Topics
  • IR News
  • Contact Us
CMJ Method
TOP/Method of Construction/CMJ Method
Method
Method
Piling Method
CP-X Method
TNーX Method
TN Method
GANTETSU PILE Method
NS ECO-PILE Method
ATT Column Method
CMJ Method
EAZET Method
HiFB Method
Soil Improvement Method
TENOCUBE Method
TENOCOLUMN Method
TENOCOLUMN-ECO Method
Lattice-Shaped Ground Improvement
PURE PILE Metohd
Wave Impeding Barrier
BASE Balance Method
CDM-LODIC Method
CMJ Method
Concrete pile inner excavation pile method Cement milk injection stirring method
In the CMJ method, excavation is performed while the soil inside the pipe is discharged using a screw head inserted inside the concrete pile. After reaching the specified support layer, cement milk is injected at high pressure and hardens, thus forming an expanded foot protection to support the structure. This method is widely applied in the fields of architecture and civil engineering.
Feature
Pile diameters from 400mm to 1000mm can be designed
Support is provided by large foot protections (1.2 to 2.0 times the pile diameter).
Construction efficiency is high and it is effective in shortening the construction period.
Widely applicable to civil engineering and architecture, with an extensive record of performance.
Also applicable as SC pile (with outer shell steel pipe).
"Pile tip large foot protections"
2ement milk is sprayed at a pressure of 200 kg/cm2 or more to form an enlarged foot protection.The compressive strength is strong with 200-400 kg/cm2.It evaluate support power in sand and gravel layer.
Construction Method
1
Drills until a specified support level while using an auger screw to excavate and discharge sediment at the tip of the pile.
2
When the head reaches the tip level, pre-drilling fluid is injected from the jet nozzle of the head at a pressure of 50 to 150 kg/cm2.
3
After preliminary excavation, cement milk is sprayed at a pressure of 200 kg/cm2 or more to form an enlarged foot protection.
Detached house
Store (Supermarket)
Educational facility
Factory
Airport facilities
Stadium
Station
Residentilal building
Data center
Office building
Logistics facilities
Shopping mall
Hospital
Pedestrian deck
Road bridge pier
Railway bridge pier
Abutment
Water and sewage facilities
REPLAY
Detached house
Store (Supermarket)
Educational facility
Factory
Airport facilities
Stadium
Station
Residentilal building
Data center
Office building
Logistics facilities
Shopping mall
Hospital
Pedestrian deck
Road bridge pier
Railway bridge pier
Abutment
Water and sewage facilities
General building・Special building
Small-scale
Store (Supermarket)
Mid-scale
Educational facility
Factory
Airport facilities
Stadium
Station
Residentilal building
Data center
Office building
Large-scale
Logistics facilities
Shopping mall
Hospital
Small-scale building
Detached house
Civil engineering structures
Small-scale
Pedestrian deck
Large-scale
Road bridge pier
Railway bridge pier
Abutment
Water and sewage facilities
Liquefaction countermeasures
Liquefaction countermeasures
Vibration control
Vibration control
Construction Method
Piling Method
CP-X Method
TN-X Method
TN Method
GANTETSU PILE Method
NS ECO-PILE Method
ATT Column Method
CMJ Method
EAZET Method
HiFB Method
Soil Improvement Method
TENOCUBE Method
TENOCOLUMN Method
TENOCOLUMN-ECO Method
Lattice-Shaped Ground Improvement
PURE PILE Metohd
Wave Impeding Barrier Method
BASE Balance Method
CDM-LODIC Method

技術情報テノックスの技術開発体制をご紹介します

VIEW MORE

Company
  • Message
  • Management Philosophy
  • Company Profile
  • List of officers
  • History
  • Organization chart
  • Business information
  • Base information
Investor Relations
  • Management Policy
  • Corporate Performance and Financial Affairs
  • IR Library
  • To Individual Investors
  • Electronic public notice
  • IR News
  • Current Stock Price
  • FAQ
  • Disclaimer
  • IR Inquiries
Method of Construction
  • Support for buildings
  • Civil engineering structures
  • Prevent landslides
  • Prevent soil liquefaction
  • Reduce environmental load
  • Reinforce earthquake resistance
CSR
  • Basic Concept of CSR
  • Safety and Health Basic Policy
  • Information Security Basic Policy
  • General Employers Action Plan
  • Act on Promotion of Female Participation
  • Topics
  • IR News
  • Contact Us
  • Language Switcher

    • EN
    • JP

Contact Us

© Tenox Co., Ltd. All Rights Reserved.