TN Method
Steel pipe inner excavation pile method and cement milk injection stirring method
In the TN method, drilling is performed while removing soil from inside the pipe via an auger screw inserted inside of the steel pipe pile. After reaching the specified support layer, cement milk is filled via high-pressure injection and the foot protection is hardened. These foundation pile methods support structures through the formed expanded foot protections for the tips. The methods are widely used in the civil engineering and construction fields, and they can also be applied to steel pipe sheet pile foundations.
Feature
Excavation performance is high and long construction is possible
Wide applicability and extensive record of performance
Applicable to steel pipe sheet pile foundations
Construction is highly efficient and effective in shortening the construction period
Construction Method

General building・Special building
Small-scale
Mid-scale
Large-scale
Small-scale building
Civil engineering structures
Small-scale
Large-scale
Liquefaction countermeasures
Vibration control
Construction Method
Piling Method


Soil Improvement Method