Building structureLogistics warehouses (5 floors to 6 floors)
| Load Level | Support Layer Depth | Method | 
|---|---|---|
| 【Heavy】 ~20,000kN/pillar or ~200kN/square meter  | 
        【Shallow】 2m~10m  | 
        TENOCOLUMN Method | 
| WIB Method | ||
| SAVE COMPOSER Method | ||
| TOFT Method | ||
| 【Middle】 5m~40m  | 
        NS ECO-PILE Method | |
| 【Deep】 10m~80m  | 
        TN-X Method | |
| NS ECO-PILE Method | 
Select by load/soil conditions
Building structure
- Detached homes (1 floor to 3 floors)
 - Stores/townhouses (2 floors to 3 floors)
 - Commercial buildings/residential complexes (4 floors to 5 floors)
 - Hospitals/schools (4 floors to 5 floors)
 - Factories (4 floors to 5 floors)
 - Logistics warehouses (5 floors to 6 floors)
 - Mid- and high-rise buildings/condominiums (5 floors to 15 floors)
 - Out-of-plane seismic resistance
 
Civil engineering structures
Select by purpose
Support for buildings
Civil engineering structures
Reinforce earthquake resistance
Prevent soil liquefaction
Reduce environmental load
Prevent landslides
Construction Methods
Pile Method
- TN-X Method
 - TN Method
 - GANTETSU PILE Method
 - NS ECO-PILE Method
 - ATT COLUMN Method
 - CMJ Method
 - EAZET Method
 - HiFB Method
 
Ground improvement method
- TENOCOLUMN Method
 - TENOCOLUMN ECO Method
 - TOFT Method
 - PURE PILE Method
 - WIB Method
 - BASE BALANCE Method
 - CDM-LODIC Method
 
